Job Hours Report - JC
Make the following menu selections to display this tab:
Job Cost—Reports—Job Cost Reports—Job Hours
Use this page to print the Job Hours report.
This report can be printed as part of a Series
of Reports.
Report Description
The Job Hours Report is used to list all hours for labor
and equipment cost activities. The report compares actual hours to estimated
hours and forecasts the final hours on an activity for either weekly or
period hours. It prints for
all currently selected EntitiesCompanies
in EntityCompany
ID order.
Field Managers can use the report to determine which
cost activities are behind or ahead of hours budgets. Project Managers
can use the report to review weekly labor progress.
To Print the Report
Refer to Job Costing
Reports Questions or the Reports Questions
Matrix for more information about the questions.
- From the Job Cost
menu, select Reports—Job
Hours.
- Click Select
EntitiesCompanies.
Select the EntitiesCompanies
for which you want to print the report and click Save.
- From
the Cut
Off Date field, use the
to select a date, if desired. The default cut off date is the future date
of 12/31/9999.
- Select an option
for Include Jobs.
Options are: Open and Closed (default), Open, Closed.
If you select Closed, enter From and Thru dates in the new fields that
appear.
- (Optional) For the various From and Thru
fields (for Job,
Phase, and Cost), use the Lookup icon for each field
to enter a starting and ending entry for the range.
To run the report for only one Job, Phase, or Cost Type, select the
same entry for the From and Thru fields.
- Select check boxes
for all cost
categories you want to include on the report. Options include:
All (default), Admin, Labor, Equipment, Material, Subcontract, Other.
- At Include
which cost activities, select an option:
All (default), All activities with postings between, Only activities
with postings between.
- Select a printing
format for the report:
Job totals, phase totals, and cost activity detail (default)
Job totals only
Job totals and phase totals
Job totals and cost activity detail.
- Check or uncheck
check boxes, as applicable, to
define how you want the report to print. Options include:
New page for each job - The default is unchecked. Check the
box if you want to print a new page for each job.
Calculate projected variance only if % complete is greater than the
specified % - The default is checked and the default percentage
in the field is 15.00, which is used in the calculation. Accept the default
percentage, change the percentage, or uncheck the box and do not use this
calculation..
Print only items with a current variance over/under JTD budget by the
specified % -
The default is unchecked. Check the box and enter a percentage if you
want the system to print these items in the report.
Print which hours - The default is to print ALL hours for the
Week.
First choose to print hours for one of these two options: Week or Period.
Then choose to print one of these three options:
All, With JTD OT Hours, or With OT Hrs this Week/Period.
Select jobs by code - When checked, a list of User Codes with
Lookups appear so that you can select one or more active Job Cost User
Codes to report on. Refer to the list of Default
User Code labels for Job Cost for more information.
Begin % complete calculation with - Select an option to specify
how you want to begin the percent complete calculation:
Job Input (default)
Cost Activity Input
Qty/Hrs/Dollars Calculation
Include unapproved transactions - Check the box to include unapproved
transactions in the report. Uncheck to report on only approved transactions.
- Select one of the
following report printing options:
- PDF
Format: Print the report in PDF format for use in a PDF viewer,
such as Acrobat.
- Create
Spreadsheet: Prints the report in an Excel spreadsheet.
- Click Print.
If you selected Create Spreadsheet, you are prompted to open or save the
report Excel file. Otherwise, the report opens in PDF format.