Remove all existing Cost Activities from current EntityCompany copying (check box)
            Select this check box if you want to remove the 
 existing Cost Codes in the EntityCompany. 
 
            NOTES:
            By default, existing Cost Activities, as determined 
 by the Phase number and Job number within the current EntityCompany, 
 are not overwritten by this process. If you want to replace the existing 
 Cost Codes, then select the option, Remove 
 all existing Cost Activities from current EntityCompany before copying. 
 
            If you want to replace the existing Cost Activities, 
 then select the option, Remove all existing 
 Cost Activities from current EntityCompany before copying. This option allows 
 all existing Cost Activities for the current EntityCompany to be cleared prior to copying. 
 
            You can also select this option and not select 
 any Cost Codes to be copied. This removes all Cost Activities entirely 
 from the selected EntityCompany.
            Copy Cost Codes (check 
 boxes)
            The system lists all Cost Codes in the 
 system, each with a check box, so that you can select the Cost Activities 
 for those Cost Codes to copy into the current EntityCompany. 
 
            Electrical 
            Excavation 
            Flooring 
            General Contracting 
            HVAC 
            Insulation 
            Interior 
            Landscaping 
            Masonry 
            Mechanical 
            Plumbing 
            Refrigeration 
            Road Building 
            Roofing 
            Utility
         
        
            Permissions must be set in the System module to access 
 all Duplicate Jobs activities.
            System module—Security—Users—Job Cost—Special—Housekeeping—Copy 
 Supplied Cost Activities